Owned Vessels & Equipment

Cable laying, burying, and transport barge services

NEW TRENCHING ROV

image of NEW TRENCHING ROV

<New ROV> Scheduled to debut in 2026

Construction of offshore wind farms has already begun, with the goal of achieving a carbon-neutral, decarbonized society by 2050. Construction in general waters will begin in 2027, marking full-scale implementation.
With an eye toward that future, we have decided to introduce the cutting-edge, highly functional ROV, the SMD QT1200.As of 2025, we proudly hold the No. 1 track record for undersea power cable burial work in Japan. Building on this experience and track record, we have held extensive discussions with SMD to create a custom-built ROV. The burial mechanism has been boldly upgraded, and areas that are over-spec compared to the standard model have been removed (allowing for a more affordable solution), making it ideal for operation in Japan's coastal waters. The introduction of the ROV will increase the efficiency of burial work, allowing for safer and faster construction.

Introduction of “NEW TRENCHING ROV”

Outline

Purpose
Submarine cable installation between remote islands
Submarine cable installation for offshore wind power generation
Dimensions
Length (front to back): 5.4m, Width: 5.0m, Height: 3.7m
Weight
Air: 25t, Water: 0.8t (sunken)
Maximum water depth
5~500m
Propulsion ability
2.0k't vertical, 3.2k't front and rear, 2.0k't horizontal
Power
900kW (450kW × 2)
thruster
10 units (4 units front and rear, 2 horizontal units, 4 vertical units)
Maximum digging depth
3m (depending on seabed conditions)
Applicable diameter
Up to 500mm
Jetting Tools
2m/3m (replaceable) main jet tool
Front jet tool
Depressor
Equipment
Two ORION 7RE manipulators,
six cameras, ten lights, one forward-facing sonar,
one altimeter, one compass, two profilers
Cable detection equipment
TSS440/350 Dual Tracking system
Cable finder
Artemis